
|
 |
 |
 |

As a WGK client, we give you the best of both worlds: the
responsiveness and efficiency of a small local consultant and the experience, qualifications, and capacity of a large firm. Our local design teams utilize a network of information to give you the benefit of our cumulative expertise.
|
|
|
| |


|
|
MDOT Highway 84
 |
| |
County: Lawrence
Category: Surveying |
|
 |

WGK was selected to provide the Right-of-Way surveying and mapping phase services on this approximate 10-mile section of highway from Brookhaven, Mississippi to the Lawrence County line. Services provided by WGK include the required import of the proposed highway reconstruction plans into our CAD system and field data collection of all property / right-of-way intersects and preparation of property plats pertaining to the new right-of-way. This was required to produce the overall project appraisal maps, the individual parcel plats and the actual Warranty Deeds, Easements and Quiet Claim Deeds for this MDOT project. |


|
|
Monticello Debris Removal
 |
| |
County: Lawrence
Category: Residential/Commercial Dev. |
|
 |

WGK provided monitoring services for the debris removal from streets located within the town of Monticello, Mississippi. The project consisted of the debris removal from rights-of-way caused by Hurricane Katrina. An observation tower was setup at the landfill to monitor trucks to ensure they were loaded and measured properly. WGK monitored the loads brought in and took soil samples before and after to ensure the site had not been contaminated. Local people were hired to put money back into the community to help record daily loads. WGK inspected the roads with the assistance of FEMA to check out daily operation and to inspect the stock pile before getting approval from the town to burn the debris.
Services also provided by WGK included:
Field Monitoring
Pit Monitoring
Load Ticket Writing
Traffic Control Inspection
Daily site inspections
Track quantities for documentation & reporting to FEMA & FHWA
The project had a value of $ 45,924.00 |
|
|
|
© Willifort, Gearhart & Knight, Inc. 2007-2008
1 queries returning 2
rows in 0.061 seconds.
|