WGK Engineers & Surveyors

Projects

Transportation

hwy_90_show.jpg

Biloxi Bay Bridge Replacement

To heal a broken bridge after Hurricane Katrina, a new method of project delivery was needed.

RUS_show.jpg

Morton RUS Downtown Street Improvements

Sometimes, a small job can make a big difference to a great downtown area.

K_show.jpg

Kosciusko Traffic Signal Improvements

Why let the wind blow around the traffic signals on your busiest intersection when you can anchor them with mast arms?

mcbride_show.jpg

McBride Road and Bridge Reconstruction

A prestressed concrete bridge and box culvert are built to replace unsafe timber bridges on an important rural road.

little_springs_show.jpg

Little Springs Road Bridge Replacement

An LSBP project to replace an old, unsafe timber bridge.

I-59_20_show.jpg

Interstate 20 / 59 Bridge Widening Project

With federal safety enhancements now required on interstate bridges, the department of transportation turns to the Design-Build method of project delivery near a site in Meridian.

100E3888.JPG

Freewoods Road Bridge Replacement

A failing timber bridge from the days of old is replaced with a precast concrete span.

alcorn_show.jpg

Alcorn State University Walking and Biking Trail

WGK, Inc. performed construction engineering on a walking and biking trail leading from the entrance into Alcorn State University that went through the woods and across a pond levy until it reached the loop into the campus.

IMG_4853_(1300x757).jpg

Rex Lumber Access Road

A new owner takes over a staple industry and ramps up production, requiring an industrial access road that can absorb enormous abuse from hundreds of log trucks.

wide.JPG

Bill Arnold Road Bridge Replacement

Deep in the national forest, a new concrete bridge crosses not-so-troubled waters.

wide_crime_lab_roads.jpg

Mississippi State Crime Lab Roadway Infrastructure

The new Mississippi State Crime Lab at Whitfield is large, strong and capable. The access roads have to be so, too.

DSCN0916.JPG

Old Highway 61 Crossdrain Replacement

Dangerous holes began to erode on the sides of a newly rehabilitated road when a corrugated metal drainage pipe rusted and collapsed, and a stronger pipe was needed.

hamp2.1.jpg

HAMPSTEAD BOULEVARD PHASE I & II

Hampstead Boulevard is in Phase II of construction and will provide a much needed corridor to businesses and will help reduce congestion on Highway 80

Churchhill-guedon-rd_box.jpg

Church Hill Road & Guedon Road Bridge Replacement

Jefferson County replaces two bridges with one State Aid Project.

violet-lucky-hollow-rd1.jpg

Violet Road & Lucky Hollow Road Bridge Replacemant

Jefferson County replaces two bridges with one State Aid Project.

SAP-11(9)S Roads A-E - Various Road Repairs on Multiple Roadways in Claiborne County

Claiborne County Rehabs Multiple Roadways with State Aid Project

franklin1.jpg

SAP-19(13)S Franklin County - County Wide Reseal

38 Miles of Roadway are Rehabilitated in Franklin County